• DocumentCode
    1851757
  • Title

    Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty

  • Author

    Ding, Shengwei ; Yi, Jingang ; Zhang, Mike Tao ; Akhavan-Tabatabaei, Raha

  • Author_Institution
    Dept. of IE & OR, California Univ., Berkeley, CA
  • fYear
    2006
  • fDate
    8-10 Oct. 2006
  • Firstpage
    112
  • Lastpage
    117
  • Abstract
    Performance evaluation and schedule optimization of cluster tools is challenging, especially when the process times are with uncertainty. In this paper, the critical path method (CPM) is used to analyze the throughput of multi-cluster tools with fixed action sequence. Slacks of non-critical path actions are studied and integrated to find the average cycle time of the cluster tool. A thin film tool from Novellus is used as an example to explain this methodology
  • Keywords
    critical path analysis; optimisation; scheduling; semiconductor device manufacture; Novellus; critical path method; fixed action sequence; multi-cluster tools; performance evaluation; process times uncertainty; schedule optimization; thin film tool; throughput analysis; Automation; Job shop scheduling; Optimal scheduling; Robots; Semiconductor device modeling; Steady-state; Throughput; Timing; USA Councils; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    1-4244-0310-3
  • Electronic_ISBN
    1-4244-0311-1
  • Type

    conf

  • DOI
    10.1109/COASE.2006.326864
  • Filename
    4120330