• DocumentCode
    1852828
  • Title

    Two-Instant Reallocation in Two-Echelon Spare Parts Inventory Systems

  • Author

    Song, Huawei ; LAU, Hoong Chuin

  • Author_Institution
    Logistics Inst., Nat. Univ. of Singapore
  • fYear
    2006
  • fDate
    8-10 Oct. 2006
  • Firstpage
    342
  • Lastpage
    345
  • Abstract
    In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by Cao and Silver(2005) to consider two or more possible reallocations within a replenishment cycle
  • Keywords
    inventory management; maintenance engineering; multiechelon reparable item inventory system; replenishment cycle; spare parts reallocation; two-echelon spare parts inventory systems; Asia; Automation; Availability; Information management; Logistics; Management information systems; Mathematical model; Risk analysis; Silver; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    1-4244-0310-3
  • Electronic_ISBN
    1-4244-0311-1
  • Type

    conf

  • DOI
    10.1109/COASE.2006.326905
  • Filename
    4120371