DocumentCode
1853443
Title
Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization
Author
Raghavan, N. R Srinivasa ; Venkataramana, M.
Author_Institution
Dept. of Manage. Studies, Indian Inst. of Sci., Bangalore
fYear
2006
fDate
8-10 Oct. 2006
Firstpage
507
Lastpage
512
Abstract
The present work concerns with the static scheduling of jobs to parallel identical batch processors with incompatible job families for minimizing the total weighted tardiness. This scheduling problem is applicable in burn-in operations and wafer fabrication in semiconductor manufacturing. We decompose the problem into two stages: batch formation and batch scheduling, as in the literature. The ant colony optimization (ACO) based algorithm called ATC-BACO algorithm is developed in which ACO is used to solve the batch scheduling problems. Our computational experimentation shows that the proposed ATC-BACO algorithm performs better than the available best traditional dispatching rule called ATC-BATC rule.
Keywords
batch processing (industrial); dispatching; integrated circuit manufacture; optimisation; processor scheduling; production management; semiconductor technology; ant colony optimization based algorithm; batch formation; batch scheduling; burn-in operations; incompatible job families; parallel batch processors scheduling; semiconductor manufacturing; total weighted tardiness minimisation; traditional dispatching rule; wafer fabrication; Ant colony optimization; Conference management; Dynamic programming; Engineering management; Fabrication; Job shop scheduling; Laboratories; Processor scheduling; Scheduling algorithm; Semiconductor device manufacture;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
Conference_Location
Shanghai
Print_ISBN
1-4244-0310-3
Electronic_ISBN
1-4244-0311-1
Type
conf
DOI
10.1109/COASE.2006.326933
Filename
4120399
Link To Document