• DocumentCode
    1855933
  • Title

    Verification of life-cycle cost and reliability for the Swedish high speed train X2000

  • Author

    Burström, Bengt ; Ericsson, Goran ; Kjellsson, Ulf

  • Author_Institution
    ABB Traction AB, Vasteras, Sweden
  • fYear
    1994
  • fDate
    24-27Jan 1994
  • Firstpage
    166
  • Lastpage
    171
  • Abstract
    Each X2000 trainset is made up of one power car, one buffet car, and four first class coaches, one of which is a driving trailer. Although the top speed in service is only 210 km/h, the average speed is relatively high in international terms at about 160 km/h, reducing the travelling time between Stockholm and Gothenburg from about 4 hours to under 3 hours. Though it is acknowledged that the most important reliability work is done during the design phase, the main topic of this paper is the verification phase, i.e. the phase where the predictions carried out during the design phase is compared to the actual operating experience. The verification that was demanded in the contract was partly theoretical and partly experimental, comprising both a life support cost verification and a reliability verification
  • Keywords
    electric locomotives; railways; reliability; 160 km/h; 210 km/h; Swedish high speed train X2000; life support cost verification; life-cycle cost verification; reliability verification; Contracts; Costs; Logistics; Maintenance; Process design; Production; Rail transportation; Reliability engineering; Steel; Warranties;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 1994. Proceedings., Annual
  • Conference_Location
    Anaheim, CA
  • Print_ISBN
    0-7803-1786-6
  • Type

    conf

  • DOI
    10.1109/RAMS.1994.291102
  • Filename
    291102