DocumentCode :
1856914
Title :
When do you start to design R&M into a product? Concurrent engineering, CALS, and the R&M engineer
Author :
Ellinger, Robert S.
Author_Institution :
Grumman Data Syst., Bethpage, NY, USA
fYear :
1994
fDate :
24-27Jan 1994
Firstpage :
421
Lastpage :
426
Abstract :
This paper deals with how reliability and maintainability (R&M) requirements and other requirements of a customer are handled by various approaches to engineering: sequential, concurrent, and requirements-based concurrent. This paper details the Grumman Concurrent Engineering Infrastructure Project´s development of concurrent engineering and requirement-based concurrent engineering together with how R&M fit into the prototypes. It is concluded that requirements-based engineering is the preferred engineering approach
Keywords :
concurrent engineering; design engineering; maintenance engineering; reliability; CALS; Grumman Concurrent Engineering Infrastructure Project; computer aided aquisition/logistics support; concurrent engineering; customer requirements; maintainability; reliability; requirements-based engineering; Application software; Concurrent computing; Concurrent engineering; Costs; Data engineering; Design engineering; Maintenance engineering; Manufacturing; Reliability engineering; Thermal stresses;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Reliability and Maintainability Symposium, 1994. Proceedings., Annual
Conference_Location :
Anaheim, CA
Print_ISBN :
0-7803-1786-6
Type :
conf
DOI :
10.1109/RAMS.1994.291145
Filename :
291145
Link To Document :
بازگشت