DocumentCode
1864216
Title
The “embedded” consideration for IT project management of E-government system
Author
Weizhang, Liu
Author_Institution
Informatic Coll., South China Agric. Univ., Guangzhou, China
Volume
4
fYear
2011
fDate
13-15 May 2011
Firstpage
546
Lastpage
550
Abstract
Aiming at the problem of unbalanced development of construction and operation of E-government system in China, this paper points out that currently there exist five problems such as inconsistency, layout, flow, isolated knowledge and evaluating strategy between construction and operation of E-government system, using the field survey and theory analysis methods. Based on relevant theories, from the angle of view of IT project management, the “embedded” development strategy for construction and operation of E-government system is proposed from five aspects of IT tactic selection, IT concurrent design, IT management mode, IT management process and IT management feedback.
Keywords
government data processing; project management; IT concurrent design; IT management feedback; IT management mode; IT management process; IT project management; IT tactic selection; e-government system; embedded development strategy; field survey; theory analysis methods; Buildings; Electronic government; Environmental factors; Planning; Project management; IT project management; e-government; embedded development strategy; system construction; system operation;
fLanguage
English
Publisher
ieee
Conference_Titel
Business Management and Electronic Information (BMEI), 2011 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-1-61284-108-3
Type
conf
DOI
10.1109/ICBMEI.2011.5921030
Filename
5921030
Link To Document