DocumentCode :
1866428
Title :
UNK status and plans
Author :
Gurov, G.
Author_Institution :
Inst. for High Energy Phys., Protvino, Russia
Volume :
1
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
416
Abstract :
The 3000 GeV proton accelerating and storage complex (UNK) is now under construction at the Institute for High Energy Physics (IHEP), Protvino. The 2.7-kilometer UNK beam transfer line was commissioned with a 65 GeV proton beam during March 1994. An overview of the project´s status is given, and the construction progress is reported
Keywords :
beam handling equipment; proton accelerators; proton beams; storage rings; synchrotrons; 65 GeV; UNK; beam transfer line; construction progress; proton accelerator; proton beam; storage complex; synchrotron; Acceleration; Colliding beam accelerators; Particle beams; Physics; Proton accelerators; Resonance; Storage rings; Structural beams; Superconducting magnets; Synchrotrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.504676
Filename :
504676
Link To Document :
بازگشت