DocumentCode :
1866897
Title :
LEP status and plans
Author :
Myers, S.
Author_Institution :
LEP Div., CERN, Geneva, Switzerland
Volume :
1
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
476
Abstract :
A description is given of the present performance of LEP. The major factors related to the limitations are discussed as ate the measures currently used to overcome them. The results from the “pretzel” scheme operation in 1994 are presented as well as a brief description of the new bunch train scheme. This scheme should ultimately allow the luminosity to be doubled by increasing the number of bunches per beam to sixteen (four trains of four bunches). The results and limitations from the energy calibration by resonant depolarization are summarized. A review is then given of the performance limitations, hardware requirements, and machine studies associated with operation of LEP at energies above the W± threshold. Finally the present plans for the LEP2 timescale are given
Keywords :
beam handling techniques; calibration; colliding beam accelerators; electron accelerators; particle beam diagnostics; storage rings; synchrotrons; LEP status; LEP2 timescale; W± threshold; bunch train scheme; energy calibration; hardware requirements; luminosity; machine studies; performance; performance limitations; pretzel scheme; resonant depolarization; Calibration; Colliding beam devices; Current measurement; Electron beams; Energy loss; Hardware; Physics; Positrons; Storage rings; Synchrotrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.504696
Filename :
504696
Link To Document :
بازگشت