DocumentCode
1866975
Title
KEKB status and plans
Author
Kurokawa, Shin-ichi
Author_Institution
KEK, Nat. Lab. for High Energy Phys., Ibaraki, Japan
Volume
1
fYear
1995
fDate
1-5 May 1995
Firstpage
491
Abstract
The Japanese B-Factory project at KEK (KEKB) was approved by the Japanese government in 1994 as a five-year project and the construction of accelerator and detector started in April 1994. KEKB is an 8×3.5 GeV, two-ring, electron-positron collider in the existing TRISTAN tunnel. The luminosity goal is 1034 cm-2 s -1. KEKB has one interaction point where electrons and positrons collide at a finite angle of ±11 mad. The BELLE detector will be installed around this interaction point. KEKB will be commissioned in JFY 1998
Keywords
colliding beam accelerators; electron accelerators; storage rings; synchrotrons; 3.5 GeV; 8 GeV; BELLE detector; Japanese B-Factory project; KEK; KEKB; TRISTAN tunnel; interaction point; luminosity goal; two-ring electron+positron collider; Acceleration; Detectors; Electron beams; Government; Linear particle accelerator; Particle beams; Positrons; Radio frequency; Structural beams; Undulators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location
Dallas, TX
Print_ISBN
0-7803-2934-1
Type
conf
DOI
10.1109/PAC.1995.504699
Filename
504699
Link To Document