• DocumentCode
    1866975
  • Title

    KEKB status and plans

  • Author

    Kurokawa, Shin-ichi

  • Author_Institution
    KEK, Nat. Lab. for High Energy Phys., Ibaraki, Japan
  • Volume
    1
  • fYear
    1995
  • fDate
    1-5 May 1995
  • Firstpage
    491
  • Abstract
    The Japanese B-Factory project at KEK (KEKB) was approved by the Japanese government in 1994 as a five-year project and the construction of accelerator and detector started in April 1994. KEKB is an 8×3.5 GeV, two-ring, electron-positron collider in the existing TRISTAN tunnel. The luminosity goal is 1034 cm-2 s -1. KEKB has one interaction point where electrons and positrons collide at a finite angle of ±11 mad. The BELLE detector will be installed around this interaction point. KEKB will be commissioned in JFY 1998
  • Keywords
    colliding beam accelerators; electron accelerators; storage rings; synchrotrons; 3.5 GeV; 8 GeV; BELLE detector; Japanese B-Factory project; KEK; KEKB; TRISTAN tunnel; interaction point; luminosity goal; two-ring electron+positron collider; Acceleration; Detectors; Electron beams; Government; Linear particle accelerator; Particle beams; Positrons; Radio frequency; Structural beams; Undulators;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1995., Proceedings of the 1995
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-2934-1
  • Type

    conf

  • DOI
    10.1109/PAC.1995.504699
  • Filename
    504699