DocumentCode :
1875792
Title :
Risk-based method for cost-effective reinvestments in distribution networks
Author :
Nordgard, Dag Eirik ; Gjerde, O. ; Uthus, B.O. ; Solum, G.
Author_Institution :
Energy Res., SINTEF, Trondheim, Norway
Volume :
3
fYear :
2001
fDate :
2001
Abstract :
In deregulated power markets, electricity utilities are now facing new challenges concerning revenue cap regulations, including quality based incentives. When planning the network every grid investment should contribute to minimising the total costs related to the investment within given safety and environmental requirements. This paper describes a method used for planning the time of replacement for network components. By using the method, the utility considers both qualitative and economic criteria that have to be taken into account when evaluating different solutions. The paper also describes experience from a Norwegian utility using the method when planning renewal of distribution substations
Keywords :
costing; electricity supply industry; investment; power distribution economics; power distribution planning; risk management; substations; Norway; cost-effective reinvestments; costs minimisation; deregulated power markets; distribution networks; distribution substations renewal planning; economic criteria; electricity utilities; environmental requirements; grid investment; qualitative criteria; revenue cap regulations; risk-based method; safety requirements; Costs; Electricity supply industry deregulation; Environmental economics; Intelligent networks; Investments; Power generation economics; Power markets; Risk management; Safety; Substations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Tech Proceedings, 2001 IEEE Porto
Conference_Location :
Porto
Print_ISBN :
0-7803-7139-9
Type :
conf
DOI :
10.1109/PTC.2001.964891
Filename :
964891
Link To Document :
بازگشت