Abstract :
The theoretical calculation involved in the district heating upgrading of the existing large fossil fired generation units was described. A feasibility study example for an existing 600MW unit was put forward in detail. It is shown that in the feasibility study of heating upgrading scheme, more effort should be made to analyze the part load performance change of the unit except for the full load performance change, in order to get a complete overview of the upgrading effect. It is also shown that for the cogeneration upgrading schemes where the IP and LP turbine crossover piping is the steam source, there exists one balancing operation condition for each operation load condition. When the heating steam supply is lower than the balancing operation condition, the economic negative benefit due to heating supply increases rapidly, and the unit operation under this kind of condition should be avoided if possible.
Keywords :
cogeneration; district heating; power generation economics; steam power stations; IP turbine crossover piping; LP turbine crossover piping; cogeneration upgrade; district heating upgrading scheme; economic analysis; economic negative benefit; heating steam supply; large fossil fired generation unit; power 600 MW; steam source; Cogeneration upgrade; Economic analysis; Fossil fired generation unit;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Sustainable Power Generation and Supply (SUPERGEN 2012), International Conference on
Conference_Location :
Hangzhou
Electronic_ISBN :
978-1-84919-673-4
Type :
conf
DOI :
10.1049/cp.2012.1809
Filename :
6493128
Link To Document :
بازگشت