DocumentCode
1876974
Title
Short term load forecasting of Iran national power system using artificial neural network
Author
Barghinia, S. ; Ansarimehr, P. ; Habibi, H. ; Vafadar, N.
Author_Institution
Dept. of Power Syst. Oper., Niroo Res. Inst., Tehran, Iran
Volume
3
fYear
2001
fDate
2001
Abstract
One of the most important requirements for the operation and planning activities of an electrical utility is the prediction of load for the next hour to several days out, known as short term load forecasting (STLF). This paper presents STLF of Iran national power system (INPS) using artificial neural network (ANN). The developed program is based on a four-layered perceptron ANN building block. The optimum inputs were selected for the ANN considering historical data of the INPS. Instead of conventional back propagation (BP) methods, Levenberg-Marquardt BP (LMBP) method has been used for the ANN training to increase the speed of convergence. A data analyzer and a temperature forecaster are also included in the NRI STLF (NSTLF) package. The program has satisfactory results for one hour up to a week prediction of INPS load
Keywords
backpropagation; load forecasting; multilayer perceptrons; neural nets; power system analysis computing; power system planning; ANN training; Iran; Levenberg-Marquardt backpropagation method; artificial neural network; electric utilities; four-layered perceptron; operation activities; planning activities; short term load forecasting; Artificial neural networks; Convergence; Economic forecasting; Indium phosphide; Load forecasting; Power system planning; Power systems; Predictive models; Temperature; Weather forecasting;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Tech Proceedings, 2001 IEEE Porto
Conference_Location
Porto
Print_ISBN
0-7803-7139-9
Type
conf
DOI
10.1109/PTC.2001.964937
Filename
964937
Link To Document