DocumentCode :
187815
Title :
Optimal day-ahead electricity market bidding considering different ancillary services
Author :
Fjelldal, Bjornar ; Nafstad, Sjur Messel ; Klaboe, Gro
Author_Institution :
Dept. of Electr. Power Eng., Norwegian Univ. of Sci. & Technol. (NTNU), Trondheim, Norway
fYear :
2014
fDate :
28-30 May 2014
Firstpage :
1
Lastpage :
6
Abstract :
This paper studies optimal bidding strategies for a hydropower producer in a day-ahead market and different regulation markets. It contains two case studies, analyzing the optimal production pattern considering a pre-spot situation taking different regulation markets into account. Both the optimal bid structure between the spot market and the primary regulation market in Switzerland as well as the spot market and the secondary regulation market in Norway were investigated. Models regarding both case studies were built, and the consistency of the analysis over an entire year was tested. The results illustrate how a small change in the utilization of the watercourse can be very lucrative when considering an additional regulation market, and discusses the importance of correctly calculated water values and profit factors with such ancillary services present.
Keywords :
hydroelectric power stations; power markets; tendering; Norway; Switzerland; ancillary services; hydropower producer; optimal bid structure; optimal day-ahead electricity market bidding; optimal production pattern analysis; primary regulation market; profit factors; secondary regulation market; spot market; Equations; Mathematical model; Optimization; Production; Reservoirs; Solid modeling; model development; multi-market optimization; primary regulation; regulation markets; secondary regulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
European Energy Market (EEM), 2014 11th International Conference on the
Conference_Location :
Krakow
Type :
conf
DOI :
10.1109/EEM.2014.6861234
Filename :
6861234
Link To Document :
بازگشت