DocumentCode :
1883646
Title :
High-power RF window and coupler development for the PEP-II B factory
Author :
Neubauer, M. ; Fant, K. ; Hodgson, J. ; Judkins, J. ; Schwarz, H. ; Rimmer, R.A.
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
3
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
1803
Abstract :
We describe the fabrication and testing of the RF windows designed to transmit power to the PEP-II 476 MHz cavities. Design choices to maximize the reliability of the window are discussed. Fabrication technologies for the window are described and finite-element analysis of the assembly process is presented. Conditioning and high-power testing of the window are discussed. Design of the coupler assembly including the integration of the window and other components is reported
Keywords :
accelerator RF systems; electron accelerators; finite element analysis; storage rings; 476 MHz; PEP-II B factory; cavities; coupler development; finite-element analysis; high-power RF window; Assembly; Ceramics; Copper; Fabrication; Linear accelerators; Materials testing; Production facilities; Radio frequency; Steel; Temperature;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.505367
Filename :
505367
Link To Document :
بازگشت