DocumentCode
1884732
Title
DESY III-dump system with one fast kicker
Author
Ruemmler, J.
Author_Institution
DESY, Hamburg, Germany
Volume
3
fYear
1995
fDate
1-5 May 1995
Firstpage
1933
Abstract
The dump system works at an injection momentum of 350 MeV/C. The kicker, with a rise time of t=90 ns and a variable pulse length up to t=3 μs, can eject the entire DESY III beam or only a section into the dump. For test runs DESY III can operate with only a few proton bunches. Beam loss at high energies results then in minimal radioactivity in DESY III, the transport channel and in PETRA. Short pulse operation of the kicker can also cut one out of the ten bunches into the dump. This gap protects the ejection septum from irradiation
Keywords
accelerator magnets; electromagnets; electron accelerators; particle beam extraction; storage rings; synchrotrons; 3 mus; 90 ns; DESY III; beam loss; dump system; ejection septum; fast kicker; proton bunch; pulse length; rise time; short pulse operation; Cables; Ferrites; Frequency; Impedance; Magnetic separation; Optical pulses; Optical reflection; Switches; Thyratrons; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location
Dallas, TX
Print_ISBN
0-7803-2934-1
Type
conf
DOI
10.1109/PAC.1995.505411
Filename
505411
Link To Document