• DocumentCode
    1885156
  • Title

    Early operating and reliability experience with the CEBAF DC magnet power supplies

  • Author

    Merz, W. ; Flood, R. ; Martin, E.J. ; O´Sullivan, M.

  • Author_Institution
    Continuous Electron Beam Accel. Facility, Newport News, VA, USA
  • Volume
    3
  • fYear
    1995
  • fDate
    1-5 May 1995
  • Firstpage
    1991
  • Abstract
    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 A, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually by a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as “box power supplies”. Arc loads consist of some 30-40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. We describe the systems mentioned, their reliability problems, the fixes implemented to date and some plans for the future
  • Keywords
    electron accelerators; linear accelerators; power supplies to apparatus; power system reliability; 20 A; CEBAF accelerator; DC magnet power supplies; active shunts; box power supplies; correction dipoles; correction quadrupoles; correction sextupoles; operation; path length control doglegs; reliability; septa box; transport channel; trim power supply; Accelerator magnets; Communication system control; Control systems; Electron accelerators; Electron beams; Linear accelerators; MOSFETs; Magnetic separation; Power supplies; Power system reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1995., Proceedings of the 1995
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-2934-1
  • Type

    conf

  • DOI
    10.1109/PAC.1995.505431
  • Filename
    505431