Title :
An Alternative Stochastic Simulation Model for Estimating Construction Time Durations
Author :
Choi, Jaehyun ; Minchin, Edward R. ; Lee, Seunghyun
Author_Institution :
Sch. of Archit. Eng., Korea Univ. of Technol. & Educ., Chonan, South Korea
fYear :
2010
fDate :
16-18 Dec. 2010
Firstpage :
1
Lastpage :
6
Abstract :
High level of uncertainty is one of the most distinct characteristics of construction operations. This is especially true when it comes to estimating construction operation durations because the operations are performed in the field where unpredictable site conditions may influence production. In order to expedite the modeling, analysis, and optimization of a construction operation, computer simulation has been utilized in construction with the help of computer information technology. Due to the nature of computer simulation, most simulation methods have difficulty responding to delays and interruptions once the simulation begins. The researchers suggest that the durations of construction operation be estimated by utilizing computer simulation methods that are capable of reflecting construction delays and interference. The research results showed that applying interference factors to the productivity estimation improved its accuracy.
Keywords :
construction industry; digital simulation; estimation theory; stochastic processes; alternative stochastic simulation model; computer information technology; computer simulation method; construction delays; construction interference; construction time duration estimation; Asphalt; Computational modeling; Interference; Load modeling; Productivity;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Ubiquitous Information Technologies and Applications (CUTE), 2010 Proceedings of the 5th International Conference on
Conference_Location :
Sanya
ISSN :
1976-0035
Print_ISBN :
978-1-4244-8813-1
Type :
conf
DOI :
10.1109/ICUT.2010.5677792
Filename :
5677792
Link To Document :
بازگشت