DocumentCode :
1889747
Title :
Integrated campaign probabilistic cost, schedule, performance, and value for program office support
Author :
Cornelius, David ; Sasamoto, Washito ; Daugherty, Kevin ; Deacon, Shaun
Author_Institution :
Anal. Mech. Assoc., Anal. Mech. Assoc., Inc., Hampton, VA, USA
fYear :
2012
fDate :
3-10 March 2012
Firstpage :
1
Lastpage :
12
Abstract :
This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a “campaign”, defined to be a series of planned space-based missions. Originally designed as an aid in planning the execution of missions to accomplish the goals of the National Research Council 2007 Earth Science Decadal Survey, the tool utilizes Monte Carlo simulation of campaigns for assessment of resource requirements and expected return on investment. Interactions between simulated missions, such as competition for launch site manifest, are incorporated to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
Keywords :
probability; space vehicles; NASA langley research center; integrated campaign probabilistic cost; national research council 2007 Earth science decadal survey; program office support; space-based missions; Data models; Delay; Instruments; Probabilistic logic; Reliability; Schedules; Vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Aerospace Conference, 2012 IEEE
Conference_Location :
Big Sky, MT
ISSN :
1095-323X
Print_ISBN :
978-1-4577-0556-4
Type :
conf
DOI :
10.1109/AERO.2012.6187434
Filename :
6187434
Link To Document :
بازگشت