DocumentCode :
1896819
Title :
Beam monitors for the S-band test facility
Author :
Radloff, W. ; Wendt, M.
Author_Institution :
DESY, Hamburg, Germany
Volume :
4
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
2616
Abstract :
The design of electromagnetic monitors for observation of beam charge and position of single bunches in long bunch trains is presented. With a repetition rate of 50 Hz, each of the 125 bunches in the linac´s macropulse has to be observed simultaneously. Resistive wall current and button pick-up stations will monitor the beam along the injector. Betweeen the S-band acceleration structures precision stripline pick-ups will be used. Here a one micron position resolution within 16 ns bunch-to-bunch spacing may be obtained in combination with well matched broadband rf-electronics. For future linear colliders these bunch by bunch measurements are required to fulfill the constraints given by advanced beam-based alignment techniques.
Keywords :
beam handling techniques; colliding beam accelerators; electron accelerators; linear colliders; 50 Hz; S-band acceleration structures; S-band test facility; advanced beam-based alignment techniques; beam charge; broadband RF-electronics; bunch by bunch measurements; button pick-up stations; electromagnetic monitors; linear colliders; long bunch trains; precision stripline pick-ups; resistive wall current; Acceleration; Capacitance; Cutoff frequency; Extraterrestrial measurements; Linear particle accelerator; Monitoring; Particle beams; Position measurement; Test facilities; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX, USA
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.505636
Filename :
505636
Link To Document :
بازگشت