Foundation design and construction challenges at river crossing for 345 kV transmission line
Author :
Karels, Lucas D.
Author_Institution :
Energy Business, Structural Engineer, Stanley Consultants, Inc., Minneapolis, Minnesota USA
fYear :
2014
fDate :
14-17 April 2014
Firstpage :
1
Lastpage :
5
Abstract :
River crossings are inevitable when designing and constructing foundations for cross-country transmission lines. Factors such as dramatic terrain changes, long spans, heavy loading, and unfavorable soil conditions create significant challenges for engineers and contractors. This paper will present a case history of one particular river crossing on the CapX20201 Brookings County to Hampton 345 kV Transmission Project and how the design team worked with the contractors to overcome several obstacles to construct the foundations.
Keywords :
Artesian; Foundation; Geotechnical Engineering; Power Transmission; Structural Engineering;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
T&D Conference and Exposition, 2014 IEEE PES