DocumentCode
1905564
Title
The Bi-Level Program and Simulated Annealing Algorithm for the Construction Sequence of Transport Network
Author
Deng Lian-bo ; Shi Feng
Author_Institution
Sch. of Traffic & Transp. Eng., Central South Univ., Changsha, China
Volume
2
fYear
2009
fDate
10-11 Oct. 2009
Firstpage
279
Lastpage
282
Abstract
Based on the actual characteristics of transport network design, the construction sequence problem of transport network was put forward. According the relationship between designer and user of network, taking the total costs of the network construction stages as the up-level program and the traffic flow user equilibrium model of different stages of the transport network construction as the lower-level program, it set up the bi-level program and designed the simulated annealing algorithm. A numerical example of multi-stage constructing transport network on the condition of fixed and unfixed traffic flow was carried out and analyzed. The calculating result shows that the bi-level grogram and its algorithm can provide decision support for the transport network design effectively.
Keywords
road traffic; simulated annealing; transportation; bilevel program; construction sequence; multistage constructing transport network; simulated annealing; traffic flow user equilibrium model; transport network construction; transport network design; unfixed traffic flow; up-level program; Algorithm design and analysis; Computer networks; Costs; Design automation; Intelligent networks; Investments; Roads; Simulated annealing; Telecommunication traffic; Traffic control; bi-level program; simulated annealing algorithm; transport network construction sequence;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Computation Technology and Automation, 2009. ICICTA '09. Second International Conference on
Conference_Location
Changsha, Hunan
Print_ISBN
978-0-7695-3804-4
Type
conf
DOI
10.1109/ICICTA.2009.305
Filename
5288043
Link To Document