Pleasant Prairie Switchyard reconfiguration
Author
Steffen, Andrew M ; Betthauser, Tom ; Johannes, Jay ; Mikolajczyk, Barbara ; Bredin, Randy ; King, Randy ; Fitterer, Chad
Author_Institution
Power Delivery Services, Sargent & Lundy LLC, Chicago, IL, USA
fYear
2014
fDate
14-17 April 2014
Firstpage
1
Lastpage
5
Abstract
Among the primary goals of utilities is replacing aging equipment. Equipment at Pleasant Prairie Switchyard was becoming increasingly unreliable and posing environmental issues. Reliability concerns with the aging equipment, requirements for upgraded protection schemes, and the desire to add an additional transmission line terminal prompted reconfiguring the existing segmented straight bus arrangement into a breaker-and-a-half arrangement. This paper will highlight the key project drivers and give a summary of the construction process.
Keywords
Breaker-and-a-half; Substation; construction;
fLanguage
English
Publisher
ieee
Conference_Titel
T&D Conference and Exposition, 2014 IEEE PES
Conference_Location
Chicago, IL, USA
Type
conf
DOI
10.1109/TDC.2014.6863508
Filename
6863508
Link To Document