Pleasant Prairie Switchyard reconfiguration
Author :
Steffen, Andrew M ; Betthauser, Tom ; Johannes, Jay ; Mikolajczyk, Barbara ; Bredin, Randy ; King, Randy ; Fitterer, Chad
Author_Institution :
Power Delivery Services, Sargent & Lundy LLC, Chicago, IL, USA
fYear :
2014
fDate :
14-17 April 2014
Firstpage :
1
Lastpage :
5
Abstract :
Among the primary goals of utilities is replacing aging equipment. Equipment at Pleasant Prairie Switchyard was becoming increasingly unreliable and posing environmental issues. Reliability concerns with the aging equipment, requirements for upgraded protection schemes, and the desire to add an additional transmission line terminal prompted reconfiguring the existing segmented straight bus arrangement into a breaker-and-a-half arrangement. This paper will highlight the key project drivers and give a summary of the construction process.
Keywords :
Breaker-and-a-half; Substation; construction;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
T&D Conference and Exposition, 2014 IEEE PES
Conference_Location :
Chicago, IL, USA
Type :
conf
DOI :
10.1109/TDC.2014.6863508
Filename :
6863508
Link To Document :
بازگشت