Title :
Method for determining amount of product released into a time sensitive operation
Author :
Levy, Jonathan ; Burda, Richard ; Stahlecker, Thomas
Author_Institution :
Microelectron., IBM, Hopewell Junction, NY, USA
Abstract :
In manufacturing environments, there are potential requirements for a manufacturing step to be performed within a specific amount of time; failure to do so could result in product being defective or scrapped. This paper will show how a simulation model was used to define which factors are of utmost importance when determining the amount of product that can be released into one of these time sensitive steps.
Keywords :
digital simulation; manufacturing processes; manufacturing step; product release; simulation model; time sensitive operation; Analytical models; Artificial intelligence; Data models; Manufacturing; Materials handling; Productivity;
Conference_Titel :
Simulation Conference (WSC), Proceedings of the 2010 Winter
Conference_Location :
Baltimore, MD
Print_ISBN :
978-1-4244-9866-6
DOI :
10.1109/WSC.2010.5678948