DocumentCode :
1910416
Title :
Wireless Communication Management Model of Workshop and Warehouse Manufacturing System
Author :
Zhang, Yisheng ; Li, Min
Author_Institution :
State Key Lab. of Mater. Process. & Die & Mould Technol., Huazhong Univ. of Sci. & Technol., Wuhan, China
Volume :
4
fYear :
2009
fDate :
10-11 Oct. 2009
Firstpage :
121
Lastpage :
123
Abstract :
With the development of global manufacturing organizations, some automobile body companies outsource blanking process to the professional factories which have decoiling & blanking & stacking production lines. In order to supply kinds of sheet-metal just in time, the blanking factories often have large-scale warehouse of nonstandard coils. So workshop-material-flow and warehouse management became a hot research issue. Traditional Manufacturing System has many defaults, such as, manual business process management, information flowing delay after material flowing, high mistakes ratio, stacking and crane job schedule in a state of chaos, very much production waste, and hard to manage the storage. After investigation and study of blanking factories, we propose an intelligent control of material flow base on wireless communication in sheet-metal blanking workshop and storage management System to solve the difficulties by following advanced manufacturing and management theories. With our prototype workers can use wireless PDA follow the intelligently instruction to do multi-process material-flow-job scheduling, calculation and allocation of storage space, storage monitor, and production execution monitor.Our work has been implemented and putted to use in a large-scale automobile sheet-metal blanking company, which improves automated administration level.
Keywords :
automobile industry; blanking; flow shop scheduling; just-in-time; organisational aspects; outsourcing; radiocommunication; sheet metal processing; warehousing; automobile body companies; crane job schedule; information flowing delay; intelligent control; manual business process management; multi-process material-flow-job scheduling; nonstandard coils; production execution monitor; production waste; professional factories; sheet-metal just in time; storage monitor; storage space; warehouse manufacturing system; wireless communication management model; workshop-material-flow; MES; Manufacturing System; WSN; Wireless Communication;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Computation Technology and Automation, 2009. ICICTA '09. Second International Conference on
Conference_Location :
Changsha, Hunan
Print_ISBN :
978-0-7695-3804-4
Type :
conf
DOI :
10.1109/ICICTA.2009.746
Filename :
5288228
Link To Document :
بازگشت