DocumentCode
1910702
Title
PER: A Process Control Methodology for Development Testing
Author
Crow, Larry H.
fYear
2007
fDate
22-25 Jan. 2007
Firstpage
305
Lastpage
310
Abstract
In this paper we discuss a continuous evaluation control chart methodology that effectively assesses the data during development testing and evaluates if the management strategy and design are sufficient to support meeting the target reliability. The methodology utilizes a ´dial up´ feature where the target requirement is an input and the methodology determines key parameters and control chart limits that are necessary to meet the requirement. If the parameters fall outside the limits then a caution is raised which allows management to investigate the situation and take early corrective action if necessary.
Keywords
continuous improvement; control charts; process control; reliability; PER; continuous evaluation control chart methodology; control chart limits; design; development testing; dial up feature; management strategy; process control methodology; target reliability; Control charts; Data analysis; Design engineering; Information analysis; Process control; Process planning; Reliability engineering; Resource management; System testing; Target tracking;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability and Maintainability Symposium, 2007. RAMS '07. Annual
Conference_Location
Orlando, FL
ISSN
0149-144X
Print_ISBN
0-7803-9766-5
Electronic_ISBN
0149-144X
Type
conf
DOI
10.1109/RAMS.2007.328068
Filename
4126368
Link To Document