• DocumentCode
    1910702
  • Title

    PER: A Process Control Methodology for Development Testing

  • Author

    Crow, Larry H.

  • fYear
    2007
  • fDate
    22-25 Jan. 2007
  • Firstpage
    305
  • Lastpage
    310
  • Abstract
    In this paper we discuss a continuous evaluation control chart methodology that effectively assesses the data during development testing and evaluates if the management strategy and design are sufficient to support meeting the target reliability. The methodology utilizes a ´dial up´ feature where the target requirement is an input and the methodology determines key parameters and control chart limits that are necessary to meet the requirement. If the parameters fall outside the limits then a caution is raised which allows management to investigate the situation and take early corrective action if necessary.
  • Keywords
    continuous improvement; control charts; process control; reliability; PER; continuous evaluation control chart methodology; control chart limits; design; development testing; dial up feature; management strategy; process control methodology; target reliability; Control charts; Data analysis; Design engineering; Information analysis; Process control; Process planning; Reliability engineering; Resource management; System testing; Target tracking;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 2007. RAMS '07. Annual
  • Conference_Location
    Orlando, FL
  • ISSN
    0149-144X
  • Print_ISBN
    0-7803-9766-5
  • Electronic_ISBN
    0149-144X
  • Type

    conf

  • DOI
    10.1109/RAMS.2007.328068
  • Filename
    4126368