Title :
Communication network applications for calender lines
Author_Institution :
Siemens Energy & Autom. Inc., Roswell, GA
fDate :
30 Apr-1 May 1990
Abstract :
It is noted that the process of rubber calendering can be improved through the use of communication networks. Data related to calendering processes along with the real-time needs of the control system are presented. Alternative technologies are evaluated for effectiveness and suitability for the typical rubber plant environment. Typical improvements achieved by the use of communication networks are addressed. A case study involving the electrical upgrading of a wire calender is described. The results are improved system performance and a variety of savings for the rubber company
Keywords :
rubber industry; telecommunication networks; communication networks; real-time control system; rubber calendering; wire calender; Communication networks; Communication system control; Control systems; Costs; Production; Programmable control; Quality management; Regulators; Rubber; Temperature control;
Conference_Titel :
Electrical Engineering Problems in the Rubber and Plastics Industries, 1990., IEEE Conference Record of 1990 Forty-Second Annual Conference of
Conference_Location :
Akron, OH
DOI :
10.1109/RAPCON.1990.66462