• DocumentCode
    1915473
  • Title

    Simulation based FAB scheduler: SeePlan®

  • Author

    Ko, Keyhoon ; Yoo, Seock K. ; Kim, Byung H. ; Park, Bum C. ; Park, Eui S.

  • Author_Institution
    VMS Solutions Co., Ltd., Daejeon, South Korea
  • fYear
    2010
  • fDate
    5-8 Dec. 2010
  • Firstpage
    40
  • Lastpage
    48
  • Abstract
    In a typical FAB factory, various types of products are produced around the clock. Complex constraints and re-entrant flows make it difficult for a human scheduler to generate a production schedule based on his/her experience and knowledge. This paper introduces a simulation based FAB scheduler, SeePlan®, which was developed by the authors. A Korea based semi-conductor and LCD maker designated SeePlan as a standard advanced planning and scheduling solution and has used in several FAB factories around the world.
  • Keywords
    production planning; semiconductor device manufacture; semiconductor industry; FAB factories; FAB factory; FAB scheduler; LCD; SeePlan; production schedule; semiconductor industry; Bills of materials; Dispatching; Engines; Job shop scheduling; Load modeling; Loading;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), Proceedings of the 2010 Winter
  • Conference_Location
    Baltimore, MD
  • ISSN
    0891-7736
  • Print_ISBN
    978-1-4244-9866-6
  • Type

    conf

  • DOI
    10.1109/WSC.2010.5679175
  • Filename
    5679175