• DocumentCode
    1918651
  • Title

    A Case Study On Successful IS Project Management; The Quadruple Constraint as the Root for Project Success

  • Author

    Tulnón, E. ; Jaén, J.A. ; Coronado, S.

  • Author_Institution
    Madrid Polytech. Univ.
  • Volume
    2
  • fYear
    2005
  • fDate
    21-24 Nov. 2005
  • Firstpage
    1056
  • Lastpage
    1059
  • Abstract
    This paper illustrates the case of an information system (IS) project that was heading for costs and time overruns; yet it was successful. The paper describes the project, its main risks and the approach undertaken by the IS project manager to mitigate them. This article explains how the project manager turned a difficult project around and brought it under control by using basic project management techniques. The paper summarizes those techniques in five recommendations that may be valid for other projects as well
  • Keywords
    information systems; personnel; project management; risk analysis; software development management; IS project management; information system; risk management; work breakdown structure; Business; Computer aided software engineering; Costs; Electric breakdown; Electronic commerce; Information analysis; Information technology; Management information systems; Project management; Risk management; Information Systems; Information Technology; Project Management; Quadruple Constrain; Risk Management and Work Breakdown Structure;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer as a Tool, 2005. EUROCON 2005.The International Conference on
  • Conference_Location
    Belgrade
  • Print_ISBN
    1-4244-0049-X
  • Type

    conf

  • DOI
    10.1109/EURCON.2005.1630131
  • Filename
    1630131