Project scheduling in AND-OR Graphs based on Design Structure Matrix
Author :
Ren, Lidi ; Bai, Sijun ; Guo, Yuntao
Author_Institution :
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
fYear :
2010
fDate :
8-10 Aug. 2010
Firstpage :
161
Lastpage :
164
Abstract :
This paper considers a project scheduling problem in AND-OR Graphs which include two types of nodes to represent the relationship of predecessor and successor. The problem is to find the earliest starting times for all activities and calculate the project duration. Using the Design Structure Matrix to capture the information flow between two tasks, a model was given to solve the problem in this paper.
Keywords :
graph theory; project management; scheduling; AND-OR graphs; design structure matrix; project scheduling; Analytical models; Book reviews; Educational institutions; Real time systems; Robots; AND-OR Graphs; design structure matrix; project scheduling problem;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Emergency Management and Management Sciences (ICEMMS), 2010 IEEE International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-6064-9
Type :
conf
DOI :
10.1109/ICEMMS.2010.5563476
Filename :
5563476
Link To Document :
بازگشت