• DocumentCode
    1934748
  • Title

    Evaluation of avoided operating cost utilizing a probabilistic technique

  • Author

    Gupta, R. ; Chowdhury, N. ; Billinton, R. ; Goel, L.

  • Author_Institution
    Singapore Polytech., Singapore
  • Volume
    1
  • fYear
    1998
  • fDate
    3-5 Mar 1998
  • Firstpage
    73
  • Abstract
    One of the most contentious issues regarding the integration of nonutility generation (NUG) energy into the short-term planning of an electric utility is the evaluation of the buyback rate. The buyback rate as presented in this paper is based on the avoided operating cost. In this paper, a probabilistic technique has been illustrated that can be used to evaluate the appropriate avoided operating cost. This technique can be utilized to provide enhanced appreciation of the inclusion of NUG in short-term utility planning. It can be used by utilities as a basic framework upon which relevant power system operating criteria and cost parameters can be added
  • Keywords
    costing; economics; electric power generation; electricity supply industry; power system planning; probability; avoided operating cost; buyback rate; cost parameters; electric utility; nonutility generation; power system operating criteria; probabilistic technique; short-term planning; Cogeneration; Cost function; Delay; Job shop scheduling; Load forecasting; Power generation; Power generation economics; Power generation planning; Power system planning; Technology planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy Management and Power Delivery, 1998. Proceedings of EMPD '98. 1998 International Conference on
  • Print_ISBN
    0-7803-4495-2
  • Type

    conf

  • DOI
    10.1109/EMPD.1998.705423
  • Filename
    705423