DocumentCode :
1935206
Title :
A Fuzzy Scheduling Method in Equipment Grid
Author :
Yin, Jie ; Wang, Yue-xuan ; Wu, Cheng
Author_Institution :
Tsinghua Univ., Beijing
Volume :
6
fYear :
2007
fDate :
19-22 Aug. 2007
Firstpage :
3099
Lastpage :
3103
Abstract :
Equipment grid and equipment pool model of equipment grid are introduced. The process from submitting a job in equipment grid to obtaining of results is analyzed. A fuzzy scheduling method is proposed in equipment pool when a job is submitted to one of equipments within a pool. Fuzziness of this method lies in vagueness of users´ appraisals about experiment results and execution quality of equipments. Equipment in a pool has a probability, which can be adjusted by users´ fuzzy appraisals, to be scheduled. Users´ feedback information is used in this paper to improve execution quality. Some algorithms are provided to increase utilization ratio of equipments with high execution quality and decrease utilization ratio of those with poor execution quality. From simulation result, it is obvious that this method and related algorithms can provide users more chances with high execution quality.
Keywords :
feedback; fuzzy set theory; scheduling; equipment grid; equipment pool model; execution quality; feedback information; fuzzy appraisals; fuzzy scheduling method; Appraisal; Computer integrated manufacturing; Cybernetics; Feedback; Instruments; Joining processes; Machine learning; Prediction methods; Processor scheduling; Resource management; Equipment grid; Execution quality; Fuzzy; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Machine Learning and Cybernetics, 2007 International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4244-0973-0
Electronic_ISBN :
978-1-4244-0973-0
Type :
conf
DOI :
10.1109/ICMLC.2007.4370680
Filename :
4370680
Link To Document :
بازگشت