• DocumentCode
    1954530
  • Title

    Coordinated maintenance scheduling in power system using combined genetic algorithm and simulated annealing

  • Author

    Kumarappan, N. ; Suresh, K.

  • Author_Institution
    Dept. of Electr. Eng., Annamalai Univ.
  • fYear
    0
  • fDate
    0-0 0
  • Abstract
    The provision of un-interrupted power supply for all customers has always been one of fundamental concern of maintenance scheduling. The maintenance scheduling (MS) is characterized as a constrained optimization problem. Combined genetic algorithm and simulated annealing (CGASA) was proposed in this paper for coordinate maintenance scheduling (CMS). This approach used to find the timetable of scheduled maintenance outages in power system. The objectives of the paper are minimizing the total generator operating cost and leveling the reserve. It is observed that the proposed method is more reliable and gives better quality of solution with improved search performance. It is tested on 4 unit and 62 unit state electricity system of Victoria
  • Keywords
    cost reduction; genetic algorithms; maintenance engineering; power generation economics; power generation reliability; simulated annealing; Victoria; constrained optimization problem; coordinated maintenance scheduling; generator operating cost; genetic algorithm; planning horizon; power system; reliability; simulated annealing; state electricity system; uninterrupted power supply; Collision mitigation; Constraint optimization; Costs; Genetic algorithms; Maintenance; Power supplies; Power system reliability; Power system simulation; Simulated annealing; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power India Conference, 2006 IEEE
  • Conference_Location
    New Delhi
  • Print_ISBN
    0-7803-9525-5
  • Type

    conf

  • DOI
    10.1109/POWERI.2006.1632547
  • Filename
    1632547