DocumentCode
1957450
Title
Upgrading the Anglo-Scottish Interconnector: environmental planning
Author
Milne, Rae
fYear
1994
fDate
34431
Firstpage
42401
Lastpage
42403
Abstract
When the Applications for Consent for the new Interconnector were made in Dec. 1990 they were accompanied by a single Environmental Statement covering the work both north and south of the Scotland-England border. The Environmental Planning stage of the project began in earnest at the end of 1988. The Consultation Document which identified a preferred overhead line route for the new interconnector became the front end of the Environmental Statement. General and particular objections are summarised and the outcome of the Public Local Inquiry at Moffat in 1991 is presented
fLanguage
English
Publisher
iet
Conference_Titel
Upgrading the Anglo-Scottish Interconnector, IEE Colloquium on
Conference_Location
Glasgow
Type
conf
Filename
307911
Link To Document