DocumentCode :
1959566
Title :
Optimization study of Earned Value Method in construction project management
Author :
Ma, Xiao ; Yang, Bin
Author_Institution :
Dept. of Financial Manage., Air Force Logistics Coll., Xuzhou, China
Volume :
2
fYear :
2012
fDate :
20-21 Oct. 2012
Firstpage :
201
Lastpage :
204
Abstract :
Earned Value Method is a globally acknowledged approach in cost-schedule monitoring of construction project whose desired target is with the shortest time, the lowest cost and the highest quality. Due to the long construction cycle, high risk and extreme complexity of construction projects, traditional Earned Value Management appears somewhat limited in application, requiring introduction of an integrated management control method. Based on the above characteristics of construction programs, this paper improves traditional Earned Value Method by introducing quality cost. By this way it makes more complete Earned Value Method assessment criteria system and introduces quality performance index into traditional method performance assessment criteria system to combine schedule management, cost management and quality management. The paper then conduct a case study to compare traditional Earned Value Management with Quality Earned Value Management, which shows Quality Earned Value Management that is a scientific and effective management technique and method.
Keywords :
construction industry; costing; optimisation; performance index; project management; quality management; scheduling; construction program characteristics; construction project management; cost management; cost-schedule monitoring; earned value method; earned value method assessment criteria system; integrated management control method; long construction cycle; optimization study; performance assessment criteria system; quality earned value management; quality management; quality performance index; schedule management; Monitoring; Schedules; Budgeted cost for work performed; expense execution criteria; quality earned value management; quality performance index;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
Conference_Location :
Sanya
Print_ISBN :
978-1-4673-1932-4
Type :
conf
DOI :
10.1109/ICIII.2012.6339813
Filename :
6339813
Link To Document :
بازگشت