DocumentCode
1960137
Title
Preliminary analysis of static marking guide system of high-speed rail
Author
Liu, Qiang ; Chai, Lin
Author_Institution
Dept. of Ind. Design, Tsinghua Univ., Beijing, China
Volume
2
fYear
2010
fDate
17-19 Nov. 2010
Firstpage
1077
Lastpage
1080
Abstract
From 2010 to 2014, the construction of Chinese high-speed rail will enter an all-round harvest period. At present, China has put total 6,920 km of high-speed rail into operation and had more than 10,000 km of express highways under construction, ranking on the top in operation mileage in the world. Construction, completion and operation of high-speed rail will significantly influence the regional economy and industrial structure of China in the future. Static marking guide system of high-speed rail, as direct window of passenger service, guarantees the effective guide for passengers and embodies high quality and individualized service of high-speed rail. Static marking guide system complies with overall, systematic, standard, reasonable and scientific design concept, organizes and manages railway space order through planning and point arrangement and by means of graph, symbol, word, color and others, and effectively conveys information to passengers in a scientific way to help passengers acquire information in a more convenient and express way and arrive at the final destination accurately.
Keywords
construction; design engineering; railway engineering; roads; transportation; Chinese high-speed rail; express highways; individualized service; industrial structure; operation mileage; passenger service; planning; regional economy; static marking guide system; Argon; Rails; Static Marking Guide System; high-speed rail;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer-Aided Industrial Design & Conceptual Design (CAIDCD), 2010 IEEE 11th International Conference on
Conference_Location
Yiwu
Print_ISBN
978-1-4244-7973-3
Type
conf
DOI
10.1109/CAIDCD.2010.5681845
Filename
5681845
Link To Document