Title :
New achievements in RF cavity manufacturing
Author :
Lippmann, G. ; Pimiskern, K. ; Kaiser, H.
Author_Institution :
Dornier GmbH, Friedrichshafen, Germany
Abstract :
Dornier has been engaged in development, manufacturing and testing of Cu-, Cu/Nb- and Nb-cavities for many years. Recently, several different types of RF cavities were manufactured: a prototype superconducting (s.c.) B-Factory accelerating cavity (1-cell, 500 MHz) was delivered to Cornell University, Lab. of Nuclear Studies. A second lot of 6 s.c. cavities (20-cell, 3000 MHz) was fabricated on contract from Technical University of Darmstadt for the S-DALINAC facility. Finally, the first copper RF structures (9-cell, 1300 MHz) for TESLA were finished and delivered to DESY, two s.c. niobium structures of the same design are in production. Highlights from the manufacturing processes of these cavities an described and first performance results will be reported
Keywords :
beam handling equipment; cavity resonators; manufacturing processes; superconducting microwave devices; 1300 MHz; 3000 MHz; 500 MHz; B-Factory; Cu; Cu cavities; Cu/Nb cavities; Nb; Nb cavities; S-DALINAC; TESLA; manufacture; superconducting accelerating cavity; Chemicals; Contracts; Copper; Manufacturing; Niobium; Production; Prototypes; Radio frequency; Sheet materials; Testing;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.308721