DocumentCode :
1961554
Title :
Construction of the CEBAF RF separator
Author :
Krycuk, A. ; Fugitt, J. ; Johnson, A. ; Kazimi, R. ; Turlington, L.
Author_Institution :
Continuous Electron Beam Accel. Facility, Newport News, VA, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
939
Abstract :
The CEBAF accelerator is designed in a multipass racetrack configuration, with two 1497 MHz linear accelerator sections joined by independent magnetic transport arcs. Room temperature subharmonic RF separator cavities will be used on each independent are to extract a portion of the recirculating beam, and one additional cavity will be used to divide the final full-energy beam between CEBAF´s three experimental end stations. A single-cell prototype cavity has already been built and tested at low power levels. The next stage of the design process is the construction of a cavity capable of operation at full power, i.e. at a gradient sufficient to provide the required 100 μrad bend to a 6 GeV beam. The paper will discuss both the electrical and mechanical design of the cavity, construction techniques employed, and preliminary test results
Keywords :
beam handling equipment; cavity resonators; electron accelerators; linear accelerators; CEBAF; RF separator; construction techniques; electrical design; linear accelerator; mechanical design; single-cell; Accelerator magnets; Linear accelerators; Magnetic separation; Particle separators; Process design; Prototypes; Radio frequency; Structural beams; Temperature; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.308723
Filename :
308723
Link To Document :
بازگشت