• DocumentCode
    1962188
  • Title

    RF commissioning of the Superconducting Super Collider radio frequency quadrupole accelerator

  • Author

    Cutler, R.I. ; Arbique, G. ; Grippe, J. ; Marsden, S. ; Marrufo, O. ; Rodriguez, Roberto

  • Author_Institution
    SSC Lab., Dallas, TX, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    827
  • Abstract
    The SSC 2.5-MeV H- RFQ is powered by a 600-kW, 428-MHz pulsed RF amplifier system. The results of the SSC RFQ RF commissioning, including the measurements of cavity field stability (phase and amplitude) are presented
  • Keywords
    beam handling equipment; nuclear electronics; particle beam diagnostics; proton accelerators; radiofrequency amplifiers; storage rings; synchrotrons; 2.5 MeV; 428 MHz; 600 kW; H; H- RFQ; RF commissioning; SSC; Superconducting Super Collider; amplitude stability; cavity field stability measurement; phase stability; pulsed RF amplifier; radiofrequency quadrupole accelerator; Acceleration; Electrons; Particle beams; Phase measurement; Pulse amplifiers; Radio frequency; Radiofrequency amplifiers; Resonance; Stability; Temperature;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308759
  • Filename
    308759