DocumentCode :
1962627
Title :
Operating experience with high beta superconducting RF cavities
Author :
Dylla, H.F. ; Doolittle, L.R. ; Benesch, J.F.
Author_Institution :
Continuous Electron Beam Accel. Facility, Newport News, VA, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
748
Abstract :
The number of installed and operational β=1 superconducting RF cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed
Keywords :
cavity resonators; superconducting microwave devices; CEBAF; CERN; DESY; KEK; high beta superconducting RF cavities; operational experience; Acceleration; Electron accelerators; Electron beams; History; Laboratories; Niobium; Radio frequency; Structural beams; Temperature distribution; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.308784
Filename :
308784
Link To Document :
بازگشت