• DocumentCode
    1962840
  • Title

    Wasp Algorithm for Dynamic Scheduling Based on Manufacturing Grid

  • Author

    Zhen-qiang, Bao ; Xiang-qing, Li ; Dan, Zhang ; Peng, Wang ; Kai-zhou, Gao

  • Author_Institution
    Coll. of Inf. Engine, Yangzhou Univ., Yangzhou
  • fYear
    2008
  • fDate
    23-25 May 2008
  • Firstpage
    83
  • Lastpage
    87
  • Abstract
    To resolve dynamic job scheduling problem efficiently in manufacturing grid, a manufacturing grid system based on two-layer structure is proposed. This paper applies the theory of wasp colonypsilas interaction with environment to dynamic job shop scheduling and constructs a wasp-based scheduling decision mechanism. This paper also analyzes urgent events and rescheduling methods to deal with them respectively. At the end, the scheduling algorithm is developed and an instance is given to confirm the above mechanism.
  • Keywords
    dynamic scheduling; job shop scheduling; manufacturing systems; dynamic job scheduling; manufacturing grid; two-layer structure; wasp algorithm; Agile manufacturing; Dynamic scheduling; Flexible manufacturing systems; Heuristic algorithms; Job shop scheduling; Manufacturing processes; Middleware; Optimization methods; Resource management; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Processing (ISIP), 2008 International Symposiums on
  • Conference_Location
    Moscow
  • Print_ISBN
    978-0-7695-3151-9
  • Type

    conf

  • DOI
    10.1109/ISIP.2008.100
  • Filename
    4554062