• DocumentCode
    1963772
  • Title

    Linac upgrade plan for the KEK B-Factory

  • Author

    Enomoto, Atsushi ; Anami, Shom ; Kamitani, Takuya ; Hanaki, Hirofumi ; Shidara, Tetsuo ; Sate, I.

  • Author_Institution
    Nat. Lab. for High Energy Phys., Ibaraki, Japan
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    590
  • Abstract
    In the KEK B-Factory plan, e+/e- collider rings with 3.5 GeV positrons and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project
  • Keywords
    beam handling techniques; electron accelerators; linear accelerators; 8 GeV; KEK B-Factory; acceleration energy; beam handling; beam quality; e+/e- collider rings; full-energy injection; linac upgrade plan; Electron beams; Energy storage; Linear particle accelerator; Particle beam injection; Particle beams; Positrons; Power generation; Pulse generation; Space vector pulse width modulation; Structural beams;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308842
  • Filename
    308842