DocumentCode
1963772
Title
Linac upgrade plan for the KEK B-Factory
Author
Enomoto, Atsushi ; Anami, Shom ; Kamitani, Takuya ; Hanaki, Hirofumi ; Shidara, Tetsuo ; Sate, I.
Author_Institution
Nat. Lab. for High Energy Phys., Ibaraki, Japan
fYear
1993
fDate
17-20 May 1993
Firstpage
590
Abstract
In the KEK B-Factory plan, e+/e- collider rings with 3.5 GeV positrons and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project
Keywords
beam handling techniques; electron accelerators; linear accelerators; 8 GeV; KEK B-Factory; acceleration energy; beam handling; beam quality; e+/e- collider rings; full-energy injection; linac upgrade plan; Electron beams; Energy storage; Linear particle accelerator; Particle beam injection; Particle beams; Positrons; Power generation; Pulse generation; Space vector pulse width modulation; Structural beams;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.308842
Filename
308842
Link To Document