Title :
Linac upgrade plan for the KEK B-Factory
Author :
Enomoto, Atsushi ; Anami, Shom ; Kamitani, Takuya ; Hanaki, Hirofumi ; Shidara, Tetsuo ; Sate, I.
Author_Institution :
Nat. Lab. for High Energy Phys., Ibaraki, Japan
Abstract :
In the KEK B-Factory plan, e+/e- collider rings with 3.5 GeV positrons and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project
Keywords :
beam handling techniques; electron accelerators; linear accelerators; 8 GeV; KEK B-Factory; acceleration energy; beam handling; beam quality; e+/e- collider rings; full-energy injection; linac upgrade plan; Electron beams; Energy storage; Linear particle accelerator; Particle beam injection; Particle beams; Positrons; Power generation; Pulse generation; Space vector pulse width modulation; Structural beams;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.308842