DocumentCode
1964185
Title
Progress report on the TESLA test facility
Author
Edwards, H.T.
Author_Institution
DESY, Hamburg, Germany
fYear
1993
fDate
17-20 May 1993
Firstpage
537
Abstract
An R&D RF cavity production and test program is underway to evaluate the practicality of superconducting RF cavity systems for future linear collider applications in the 500 GeV energy region. An international collaboration organized by DESY is assembling a TESLA test facility to assess gradient, systems, and manufacturing cost issues of the superconducting RF collider option. Construction of a state of the art cavity processing facility is underway. It is proposed to build four 12 m long cryounits each with eight 9-cell superconducting cavities operating at 1.3 GHz. Two 4.5 MW, 2 msec pulse length klystrons will distribute power to the total 32 cavities. An electron gun and injector section will be included in this test facility, and beam tests with energies of about 500 MeV will be carried out
Keywords
beam handling equipment; cavity resonators; superconducting microwave devices; test facilities; 1.3 GHz; 2 ms; 4.5 MW; 500 GeV; TESLA test facility; electron gun; injector; klystrons; manufacturing cost; superconducting RF cavity; Assembly systems; Costs; Electron beams; International collaboration; Klystrons; Manufacturing; Production systems; Radio frequency; System testing; Test facilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.308860
Filename
308860
Link To Document