• DocumentCode
    1966932
  • Title

    The Risk Analysis and Evaluation of Shanghai Changjiang Tunnel and Bridge Engineering Projects

  • Author

    Zhang Guo-an

  • Author_Institution
    Sch. of Civil Eng. & Archit., Central South Univ., Changsha, China
  • fYear
    2010
  • fDate
    30-31 Jan. 2010
  • Firstpage
    342
  • Lastpage
    346
  • Abstract
    Fuzzy comprehensive evaluation method for scientific evaluation of the bridge engineering project risk indexes and improvement of the project risk management decision-making levels has some practical value. This paper introduces the Shanghai Changjiang Tunnel and Bridge Engineering´s basic situation, analyzes the major risk factors establishing risk evaluation index system based on the Shanghai Changjiang tunnel and bridge engineering and applies the fuzzy comprehensive evaluation method to the comprehensive analysis and evaluation of the project risks obtaining a larger conclusion.
  • Keywords
    bridges (structures); decision making; project management; risk analysis; tunnels; Shanghai Changjiang tunnel project; bridge engineering project; fuzzy comprehensive evaluation method; project risk evaluation; project risk management decision-making levels; risk evaluation index system; scientific evaluation; Bridges; Design engineering; Drilling; Floods; Production; Risk analysis; Risk management; Rivers; Storms; Wind; Fuzzy Comprehensive Evaluation Method; Risk Evaluation; Shanghai Changjiang Tunnel and Bridge Engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovative Computing & Communication, 2010 Intl Conf on and Information Technology & Ocean Engineering, 2010 Asia-Pacific Conf on (CICC-ITOE)
  • Conference_Location
    Macao
  • Print_ISBN
    978-1-4244-5634-5
  • Electronic_ISBN
    978-1-4244-5635-2
  • Type

    conf

  • DOI
    10.1109/CICC-ITOE.2010.103
  • Filename
    5439199