DocumentCode
1966932
Title
The Risk Analysis and Evaluation of Shanghai Changjiang Tunnel and Bridge Engineering Projects
Author
Zhang Guo-an
Author_Institution
Sch. of Civil Eng. & Archit., Central South Univ., Changsha, China
fYear
2010
fDate
30-31 Jan. 2010
Firstpage
342
Lastpage
346
Abstract
Fuzzy comprehensive evaluation method for scientific evaluation of the bridge engineering project risk indexes and improvement of the project risk management decision-making levels has some practical value. This paper introduces the Shanghai Changjiang Tunnel and Bridge Engineering´s basic situation, analyzes the major risk factors establishing risk evaluation index system based on the Shanghai Changjiang tunnel and bridge engineering and applies the fuzzy comprehensive evaluation method to the comprehensive analysis and evaluation of the project risks obtaining a larger conclusion.
Keywords
bridges (structures); decision making; project management; risk analysis; tunnels; Shanghai Changjiang tunnel project; bridge engineering project; fuzzy comprehensive evaluation method; project risk evaluation; project risk management decision-making levels; risk evaluation index system; scientific evaluation; Bridges; Design engineering; Drilling; Floods; Production; Risk analysis; Risk management; Rivers; Storms; Wind; Fuzzy Comprehensive Evaluation Method; Risk Evaluation; Shanghai Changjiang Tunnel and Bridge Engineering;
fLanguage
English
Publisher
ieee
Conference_Titel
Innovative Computing & Communication, 2010 Intl Conf on and Information Technology & Ocean Engineering, 2010 Asia-Pacific Conf on (CICC-ITOE)
Conference_Location
Macao
Print_ISBN
978-1-4244-5634-5
Electronic_ISBN
978-1-4244-5635-2
Type
conf
DOI
10.1109/CICC-ITOE.2010.103
Filename
5439199
Link To Document