DocumentCode
1967746
Title
Model and heuristic algorithm of R&D project scheduling problem with stochastic number of activity iterations
Author
Gao, Feng ; Chen, Yingwu ; Jiang, Guoping ; Liu, Yanqiong
Author_Institution
Sch. of Inf. Syst. & Manage., Nat. Univ. of Defense Technol., Changsha, China
fYear
2005
fDate
15-17 Aug. 2005
Firstpage
276
Lastpage
281
Abstract
Because project scheduling is always under the constraint of resources, the method of coupling activities to cope with activity concurrences and activity iterations in project scheduling faces many difficulties. A process model of R&D projects is presented to satisfy requirements of resource constrained project scheduling. The model integrates uncertain activity durations, uncertain activity outcomes, activity concurrence, and activity iterations into a project scheduling model. Furthermore, A heuristic rule derived from corresponding determinate network is used to resolve the scheduling problem and the algorithm is illustrated with a case.
Keywords
constraint theory; research and development; resource allocation; scheduling; stochastic processes; R&D project scheduling problem; activity iterations; determinate network; heuristic algorithm; heuristic rule; process model; resource constrained project scheduling; stochastic number; Concurrent engineering; Design optimization; Dynamic scheduling; Heuristic algorithms; Job shop scheduling; Project management; Research and development; Resource management; Scheduling algorithm; Stochastic processes;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Reuse and Integration, Conf, 2005. IRI -2005 IEEE International Conference on.
Print_ISBN
0-7803-9093-8
Type
conf
DOI
10.1109/IRI-05.2005.1506486
Filename
1506486
Link To Document