Amending schedule-cost coefficient correlation based on historical statistics
Author
Yan-Qiong, Liu ; Ying-Wu, Chen ; Feng, Gao
Author_Institution
Inf. Syst. & Manage. Sch., Nat. Univ. of Defense Technol., HuNan, China
fYear
2005
fDate
15-17 Aug. 2005
Firstpage
300
Lastpage
305
Abstract
The schedule-cost correlation coefficient is usually estimated by experts in the spaceflight project management practice. This paper deduced the schedule distribution model considering the effect of the cost uncertainty. And then theoretically analyzed and demonstrated how to amend the schedule-cost correlation coefficient according to the historical statistics based on the conditional probability distribution functions between the schedule and the cost. A general rule was put forward to ascertain the value of the schedule-cost correlation coefficient. This method was proved in analytical method. This work can correct the traditional subjective estimation method just according to the experts´ experiences and expertise.
Keywords
correlation methods; costing; space vehicles; statistical distributions; historical statistics; probability distribution function; schedule distribution model; schedule-cost coefficient correlation; spaceflight project management; subjective estimation method; Cost function; Gaussian distribution; Information management; Management information systems; Probability density function; Probability distribution; Project management; Statistical distributions; Statistics; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Reuse and Integration, Conf, 2005. IRI -2005 IEEE International Conference on.
Print_ISBN
0-7803-9093-8
Type
conf
DOI
10.1109/IRI-05.2005.1506490
Filename
1506490
Link To Document