  • Title

    Construction and commissioning of the SRRC storage ring

  • Author

    Liu, Y.C. ; Chen, J.R. ; Kuo, C.C.

  • Author_Institution
    Synchrotron Radiat. Res. Center, Hsinchu, Taiwan
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    1635
  • Abstract
    A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured
  • Keywords
    beam handling techniques; commissioning; electron accelerators; storage rings; 1.3 GeV; 1.3 GeV synchrotron radiation storage ring; BTS transfer line; SRRC storage ring; booster to storage ring transfer line; commissioning; construction; installation; storage ring beam tests; Acceleration; Extraterrestrial measurements; Lattices; Physics; Radio frequency; Storage rings; Structural beams; Synchrotron radiation; Turning; Undulators;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309084
  • Filename
    309084