Construction change factors of direct current transmission line project and their impact on schedule and costs
Author :
Zhen-Yu Zhao ; Xue, Bin-xi
Author_Institution :
Econ. & Manage. Dept., North China Electr. Power Univ., Beijing, China
Volume :
1
fYear :
2010
fDate :
10-11 July 2010
Firstpage :
171
Lastpage :
174
Abstract :
Direct Current (DC) transmission is an important part of modern power transmission system. In recent years, large numbers of DC project are under construction. The construction changes in DC projects have become a common issue. Based on the construction changes of the Three Gorges-Guangdong and the Three Gorges-Shanghai DC transmission line construction projects, this paper designs a questionnaire and conducts a questionnaire survey to management and technical staff of project owners, design firms, supervision firms and contractors. The outcome about the importance of changes factors is collected and the main factors impacting transmission line construction changes to its duration and cost are identified. Using agreement analysis method, the agreement degree of the factors impacting on the construction schedule and costs are found. The result may help to control and manage construction changes in transmission line projects.
Keywords :
DC power transmission; power transmission lines; project management; Gorges-Shanghai DC transmission line construction projects; agreement analysis method; direct current transmission line project; power transmission system; Complexity theory; Construction industry; Schedules; Agreement analysis; Construction change; DC transmission project; Transmission line;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial and Information Systems (IIS), 2010 2nd International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-7860-6
Type :
conf
DOI :
10.1109/INDUSIS.2010.5565886
Filename :
5565886
Link To Document :
بازگشت