DocumentCode
1975925
Title
SSC string test facility for superconducting magnets: testing capabilities and program for collider magnets
Author
Kraushaar, P. ; Burgett, W. ; Dombeck, T. ; McInturff, A. ; Robinson, W. ; Saladin, V.
Author_Institution
Superconducting Super Collider Lab., Dallas, TX, USA
fYear
1993
fDate
17-20 May 1993
Firstpage
2763
Abstract
The Accelerator Systems String Test (ASST) R&D Testing Facility has been established at the SSC Laboratory to test Collider and High Energy Booster (HEB) superconducting magnet strings. The facility is operational and has had two testing periods utilizing a half cell of collider prototypical magnets with the associated spool pieces and support systems. This paper presents a description of the testing capabilities of the facility with respect to components and supporting subsystems (cryogenic, power, quench protection, controls and instrumentation), the planned testing program for the collider magnets
Keywords
beam handling equipment; proton accelerators; storage rings; superconducting magnets; synchrotrons; Accelerator Systems String Test; HEB; High Energy Booster superconducting magnet strings; SSC string test facility; collider magnets; collider prototypical magnets; controls; cryogenic; half cell; instrumentation; power; quench protection; spool pieces; superconducting magnets; support systems; supporting subsystems; testing capabilities; Accelerator magnets; Cryogenics; Instruments; Laboratories; Life estimation; Power system protection; Prototypes; Superconducting magnets; System testing; Test facilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.309453
Filename
309453
Link To Document