• DocumentCode
    1976316
  • Title

    Experience with the source evaluation board method of procuring technical components for the Fermilab Main Injector

  • Author

    Harding, D.J. ; Collins, J.P. ; Kobliska, G.R. ; Chester, N.S. ; Pewitt, E.G. ; Fowler, W.B.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    2823
  • Abstract
    Fermilab has adopted the source evaluation board (SEB) method for procuring certain major technical components of the Fermilab Main Injector. The SEB procedure is designed to ensure the efficient and effective expenditure of Government funds at the same time that it optimizes the opportunity for attainment of project objectives. A qualitative trade-off is allowed between price and technical factors. The process involves a large amount of work and is only justified for a very limited number of procurements. Fermilab has gained experience with the SEB process in awarding subcontracts for major subassemblies of the Fermilab Main Injector dipoles
  • Keywords
    beam handling equipment; beam handling techniques; electromagnets; proton accelerators; synchrotrons; FMI; Fermilab Main Injector; dipoles; proton synchrotron; source evaluation board method; technical components; Contracts; Educational institutions; Government; Laboratories; Magnets; Procurement; Proposals; Qualifications; Subcontracting; US Department of Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309473
  • Filename
    309473