• DocumentCode
    1976507
  • Title

    Magnet costs for the Advanced Light Source

  • Author

    Tanabe, Jack ; Krupnick, Jim ; Hoyer, Egon ; Paterson, Alan

  • Author_Institution
    Lawrence Berkeley Lab., California Univ., CA, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    2850
  • Abstract
    The Advanced Light Source (ALS) accelerator is now completed. The numerous conventional magnets required for the booster ring, the storage ring and the low and high energy transfer lines were installed. This paper summarizes the various costs associated with the quantity fabrication of selected magnet families. These costs include the costs of prototypes, tooling, coil and core fabrication, assembly and magnetic measurements. Brief descriptions of the magnets and specialized requirements for magnetic measurements are included in order to associate the costs with the relative complexities of the various magnet systems
  • Keywords
    beam handling equipment; costing; electromagnets; electron accelerators; storage rings; 1.5 GeV; ALS accelerator; Advanced Light Source; assembly; booster ring; coil fabrication; core fabrication; high energy transfer line; low energy transfer line; magnet costs; magnet families; magnetic measurements; prototypes; quantity fabrication; storage ring; tooling; Assembly; Coils; Costs; Energy exchange; Fabrication; Light sources; Magnetic cores; Magnetic variables measurement; Prototypes; Storage rings;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309482
  • Filename
    309482